Timber Framed Extension
Client: Private
Date: 2013 (2 months)
We were approached in the summer of 2013 by a private customer who had dreamed of a wooden extension to his home, so much so he was more than happy to get our Joiners stuck into this project, From start to finish this project lasted 8 weeks, The timber frame structure was formed in our workshop by our team of highly skilled Joiners, then once ready onto site to assemble into position, we then manufactured high performance flush casement windows and a set of our beautiful Bi Folding doors to the structure opening onto the steel balcony with Hardwood Handrails, We also applied a Cedar cladding to the existing house which looks great against the Timber frame extension.